Our Projects
 
  Latest Project : Ann Joo Steel Power Monitoring System

Project: To Design and Commissioning the SCADA Power Monitoring System for Ann Joo Integrated Steel Sdn. Bhd.

Customer: Ann Joo Integrated Steel Sdn. Bhd.

 

 
  Latest Project : Genting Resorts SCADA Monitoring System

Project: Upgrading of the existing diesel operated pump system to electric operated pump system for water catchment in Genting Highlands for Resorts World Berhad.

Customer: Resorts World Bhd.

 

 
  Latest Project : KLAS Cargo SCADA Monitoring System

- To Design, Supply, Install and Commissioning the SCADA Monitoring System for KLAS Cargo.
- 4 stations in total and all are connected to a main SQL Server database via WIFI communication.
- Receive control signal from Modicon PLC via Modbus Plus communication.

Customer: KL Airport Services Sdn. Bhd

 

 
 
Puncak Niaga River Water Surveillance System ( RWSS)

To design, supply, install and commissioning the Real-time Water Quality Monitoring system for Puncak Niaga Water Treatment Plant in Klang Valley.

- Analyzer Panel.
- Control Panel with SMS function.
- Erection of shelter, piping works and pumps installation.

 

 
  Sterilizer Control System

To Design, Supply and install the Sterilizer Control System for Sterilization of Hospital Equipments.

Customer : Hospitech

 
  Hospital USM SCADA Facilities Monitoring System

To Design, Supply and install and commissioning
The SCADA Monitoring System for HUSM.

Customer : HUSM, Kelantan

 

 
  Remote Level Monitoring System

To Design and Supply the
Remote Level Monitoring System for Industrial Gases Factory in Hong Kong

Customer : Hong Kong Oxygen

 

 
 
Facilities SCADA Monitoring System

Facilities Monitoring System
For AHU, Chiller, Lift, Pumps, Compressors, Electrical, Temperature, Humidity and Room Pressure.

Customer : National Semicon. Melaka

 

 
  Infenion Facilities Maintenance

To provide engineers and technician to maintenance and support Infenion’s facilities. Our personnel will be station in the factory 24 hours per day, 7 Days per week.

Customer : Infenion Kulim